Service

Fire Protection Coating

High-performance Passive Fire Protection (PFP) and intumescent coating systems engineered to protect structural steel against hydrocarbon and cellulosic fires.

Fire protection coatings are mission-critical life safety barriers. In an industrial or infrastructure fire, unprotected structural steel loses over 50% of its load-bearing capacity once temperatures exceed 550°C, risking catastrophic structural collapse within minutes.

MetaCare India provides comprehensive Passive Fire Protection (PFP) engineering — specifying, supplying, and inspecting specialized epoxy-based PFP for extreme hydrocarbon pool/jet fire hazards and advanced thin-film intumescent coatings for cellulosic architectural and industrial steelwork.

As an Authorized Dealer of Jotun Paints, we supply genuine Jotun Steelmaster intumescent coatings and Jotachar mesh-free hydrocarbon PFP systems, backed by certified application auditing, calibrated dry film thickness (DFT) verification, and international test standards (BS 476, EN 13381, UL 1709, UL 263).

Fire Protection Coating Systems

Specialized fireproofing solutions to protect critical infrastructure against fire hazards, ensuring structural integrity during fire events.

Hydrocarbon Fire Defense

Epoxy-Based PFP

High-performance Passive Fire Protection coatings applied manually to provide extended fire resistance for critical structures.

  • Up to 4-hour fire rating
  • Hydrocarbon fire protection
  • Structural steel protection
  • Certified application teams
Thin-Film Technology

Intumescent Fireproofing Coatings

Advanced intumescent coatings that expand when exposed to heat, creating an insulating barrier against fire damage.

  • Thin-film technology
  • Aesthetic finish options
  • Conformance to fire-protection standards
  • Long-term performance monitoring

When you need this

  • Refineries, chemical complexes, and offshore assets requiring hydrocarbon PFP
  • Structural steel in commercial and industrial facilities requiring 1-4 hour fire ratings
  • Retrofitting or repairing degraded passive fireproofing on operating assets
  • Third-party inspection and DFT measurement prior to safety certification handover

What you receive

  • Fire hazard risk assessment (Cellulosic vs Hydrocarbon / Jet fire)
  • Fire rating specification (30, 60, 90, 120, up to 240 minutes)
  • Steel section factor (Hp/A or V/A) and dry film thickness (DFT) schedule
  • Certified epoxy PFP and waterborne/solvent-borne intumescent supply
  • Third-party NACE/AMPP inspection and fire-test compliance sign-off